Answer
Responsibility is usually assigned by the contract and may depend on who is licensed to submit the work, but the installer commonly handles permit applications for an installation it performs. The homeowner should not assume this: the contract should name each permit, responsible party, fee, inspection, and remedy for delay.
Key points
- Separate local construction permits from utility interconnection approval and inspections.
- Confirm whether permit fees, plan revisions, and reinspection costs are included.
- Ask who obtains final inspection approval and permission to operate.
- The property owner may still have obligations even when the installer submits applications.
What it depends on
- Written installation contract
- Local licensing and permit procedures
- Project scope and property restrictions
- Utility interconnection requirements
Risks and trade-offs
- Unclear allocation can produce unexpected fees or delays.
- A contractor's failure to obtain required approvals may affect insurance, resale, incentives, or system operation.
- The cheapest quote may exclude permit or correction work.
Information you may need
- Contract and scope of work
- Local permit checklist
- Installer license and submission responsibilities
- Utility approval and inspection requirements
Your next step
What to do next
Request a written responsibility matrix before signing, covering every permit, inspection, fee, correction, and final operating approval.