How can I find out which permits are required before signing a solar contract?
Answer
Identify the permitting authority for the property and ask which building, electrical, structural, planning, historic, or other approvals apply to the proposed work. Ask the installer to list every permit and assign responsibility for obtaining, paying for, and closing each one in the contract.
Key points
- Requirements can vary by property location, roof work, equipment, historic status, and system configuration.
- Utility interconnection approval is separate from local construction permits.
- The contract should state whether permit fees, redesigns, inspections, and corrections are included.
- Permit approval should be a condition before major nonrefundable commitments where possible.
What it depends on
- Property jurisdiction and site characteristics
- Local building, electrical, planning, and historic requirements
- System design and structural attachment method
- Contract allocation of permit responsibilities
Risks and trade-offs
- Unidentified permits can cause redesign, delay, fines, or removal risk.
- The lowest quote may exclude permit, engineering, or inspection costs.
- Starting work before required approvals can complicate insurance, resale, or enforcement issues.
Information you may need
- Property address and jurisdiction
- Proposed system drawings and equipment details
- Historic, conservation, HOA, or other property restrictions
- Written permit scope and responsibility in the contract
Your next step
What to do next
Contact the relevant permitting authority and obtain a written checklist, then reconcile it with the installer’s contract scope before signing.