What should happen in the contract if the final site inspection finds unexpected roof problems?

Answer

The contract should require written notice, documented evidence, a defined process for approving roof repairs or redesign, and a clear allocation of cost, schedule, warranty, and cancellation consequences. It should not allow material price or scope changes to be imposed without your written approval.

Key points

  • Define what qualifies as an unforeseen site condition.
  • Specify whether the installer may pause, redesign, or terminate the project.
  • Require an itemized change order before additional work begins.
  • State who is responsible for roof workmanship, resulting damage, and coordination between roofing and solar warranties.
  • Clarify whether you may cancel if the revised project is unacceptable.

What it depends on

  • Roof age, structure, covering, and condition
  • Inspection findings
  • Installer and roofer responsibilities
  • Contract change-order and termination terms

Risks and trade-offs

  • Accepting solar installation on an unsuitable roof can increase removal, damage, and warranty risks.
  • A low initial quote may exclude substantial roof work.
  • Using separate roof and solar contractors can create disputes about responsibility.

Information you may need

  • Roof inspection report and photographs
  • Original and revised scope of work
  • Itemized repair estimate
  • Roof and solar warranty terms

Your next step

What to do next

Ask for a written roof-condition contingency and require any revised scope, price, schedule, and warranty allocation to be approved in a signed change order.