How should multiple electricity meters affect a small business solar design?
Answer
Analyze each meter separately first, then determine whether the meters can be served or credited through a shared design. Meter-specific load profiles, account ownership, tariffs, demand charges, service capacity, and interconnection rules may make a single array, multiple systems, or load consolidation more appropriate.
Key points
- Do not combine bills without preserving each meter's timing, demand, and billing characteristics.
- Identify which loads are behind each meter and whether they can be electrically connected.
- Demand charges and fixed charges may make peak demand as important as annual energy.
- A system sized from total annual consumption may not reduce the most costly meter charges.
What it depends on
- Meter configuration and service voltage
- Load profile and demand at each meter
- Account ownership and billing structure
- Utility rules for shared generation, credit allocation, and interconnection
Risks and trade-offs
- Combining loads can hide a service-specific constraint or produce the wrong system allocation.
- A design that offsets energy may not materially reduce demand or fixed charges.
- Separate systems can add equipment and maintenance but may simplify meter-specific treatment.
Information you may need
- At least twelve months of bills for every meter
- Interval demand data where available
- Single-line diagram and service details
- Account ownership, tariffs, and planned operational changes
Your next step
What to do next
Prepare a meter-by-meter load and billing analysis, then ask providers to compare one shared design with separate or allocated designs.