Answer

Yes, but only after all relevant meters and loads are identified and the proposed system's relationship to each meter is understood. Combining annual totals can give a misleading design if the meters have different schedules, rates, demand components, connection limits, ownership, or rules for sharing production.

Key points

  • List every meter, the circuits it serves, and whether each is on the same property or account.
  • Analyze each meter's consumption timing and bill structure separately before considering aggregation.
  • Confirm whether the proposed system can serve the loads behind each meter or whether separate systems or a different arrangement would be needed.

What it depends on

  • Meter configuration and physical wiring
  • Account ownership and load allocation
  • Interval data and bill structures for each meter
  • Interconnection and export arrangements
  • Demand or time-based billing components

Risks and trade-offs

  • A combined annual total may oversize one meter's system or fail to serve another meter.
  • Separate meters can create additional design, approval, equipment, or monitoring requirements.
  • Moving loads between meters may affect operations and requires appropriate electrical review.

Information you may need

  • Bills and meter identifiers for all meters
  • Single-line or service configuration if available
  • Circuits and equipment served by each meter
  • Interval usage and account ownership information

Your next step

What to do next

Have an electrical designer map the meters and model each load separately before combining them in a solar proposal.