Answer
Use whole-site interval consumption as the starting point, then allocate the department's load using submetering, equipment ratings and operating schedules, temporary measurement, and production records. Do not treat a simple floor-area or headcount allocation as a reliable solar-sizing load without validation.
Key points
- Collect at least a year of bills and, if available, 15-minute or hourly interval data.
- Inventory department equipment, demand ratings, operating hours, seasonal schedules, and process changes.
- Use temporary submeters or circuit-level measurements where the department's circuits can be isolated.
- Separate the department's coincident peak demand from its annual energy use.
What it depends on
- Availability and resolution of utility interval data
- Whether department circuits can be isolated or measured
- Operating schedules, production volume, and shared equipment
- The intended allocation method and solar design objective
Risks and trade-offs
- Allocation from whole-site data can misstate the department's load when departments operate at different times.
- Equipment nameplate ratings usually overstate actual energy use but may help identify peak-demand risk.
- A department-only estimate may not match the site's tariff, demand charges, or interconnection constraints.
Information you may need
- Utility bills and interval data
- Panel schedules and electrical drawings
- Equipment inventory and operating schedules
- Production or occupancy data for the same periods
Your next step
What to do next
Ask an energy professional to create a department load estimate using interval data and temporary measurements, and document the allocation assumptions before sizing solar.
Path-Q
Find the right next step
Answer a few questions and we’ll narrow your options.
Loading…
SQ03005