Request preliminary interconnection screening early when the proposed system may be large relative to the service, includes batteries or export controls, serves a complex property, or could face capacity, voltage, transformer, or feeder constraints. It is especially useful before paying for a design whose size or export arrangement may need to change, but it does not replace the utility's formal application or approval.

Key points

  • Provide an approximate system size, service information, site address, expected export behavior, and battery details if known.
  • Ask what screening is available, what it costs, what information it requires, and whether it is binding.
  • A preliminary response may identify likely studies, upgrades, export limits, or design constraints.
  • Confirm whether the utility permits non-export, limited-export, or phased designs.

What it depends on

  • Utility interconnection process and screening criteria
  • Existing service capacity and electrical configuration
  • Proposed generation, storage, and export controls
  • Local network capacity and required studies

Risks and trade-offs

  • A preliminary review may be informal and may not reserve capacity or guarantee approval.
  • Waiting for screening can slow the project, while skipping it can create redesign or application costs.
  • A smaller or non-export design may improve feasibility but change expected savings and operating value.

Information you may need

  • Utility account and service details
  • Approximate solar and battery size
  • Single-line or existing electrical information if available
  • Proposed export mode and project timeline

Your next step

What to do next

Contact the utility or interconnection portal before commissioning a detailed design and ask for the available preliminary screening, its limitations, and the formal application path.