Pause or redesign the process when major changes in occupancy, heating, cooling, vehicles, appliances, business activity, or building use make recent bills a poor guide to future demand. You may not need to wait if the changes can be quantified and the design can be staged or expanded later.
Key points
- Separate temporary changes from durable changes before using historical consumption.
- Document expected loads, timing, operating hours, and efficiency improvements.
- Ask for scenarios showing current use, expected use, and a reasonable range.
- Avoid sizing solely to an unusually high or low billing period.
What it depends on
- Nature and timing of the load change
- Confidence in future occupancy and equipment plans
- Whether expansion or battery storage is practical
- System sizing and economic objectives
Risks and trade-offs
- Waiting can delay benefits and may require redesign later.
- Sizing to uncertain future use can lead to excess or insufficient capacity.
- A production system cannot necessarily offset every future load because export, billing, or interconnection treatment may differ.
Information you may need
- At least recent interval or monthly usage records
- Planned equipment, additions, removals, and efficiency projects
- Expected timing and operating patterns
- Installer scenarios and expansion limits
Your next step
What to do next
Build a documented current-and-future load forecast and ask installers to price a right-sized initial system plus any expansion path before deciding whether to wait.
Path-Q
Find the right next step
Answer a few questions and we’ll narrow your options.
Loading…
SQ02547