When should a landlord seek tenant input before commissioning a solar design?
Answer
Seek tenant input before commissioning a final design whenever tenant electricity use, operating hours, roof access, shared billing, or construction disruption could affect system sizing or feasibility. Early input is particularly important for multi-tenant or long-term occupied properties.
Key points
- Ask about current and expected electricity use, operating schedules, critical loads, and planned equipment.
- Discuss access, outages, noise, staging, safety, and any tenant-specific restrictions.
- Clarify whether tenants will receive benefits, face changed billing, or need to approve access or lease changes.
What it depends on
- Lease structure and utility responsibility
- Tenant load profiles and future occupancy
- Construction access and operational constraints
Risks and trade-offs
- A design based only on owner assumptions may be poorly sized or difficult to operate.
- Late tenant objections can delay construction or require redesign.
- Sharing information and benefits may require revised agreements and administration.
Information you may need
- Tenant contacts and lease provisions
- Usage data and operating schedules
- Access, outage, safety, and disruption requirements
Your next step
What to do next
Collect structured tenant input before requesting final designs, and provide installers with documented load, access, and operating constraints.