What should I verify before authorizing a solar installer to begin work?
Answer
Verify the final scope, design, price, approvals, payment terms, roof and electrical responsibilities, schedule, warranties, and change-order process before work begins. You should know what has been approved, what remains conditional, and who is responsible for correcting problems.
Key points
- Confirm the final panel layout, system capacity, expected production basis, equipment, and any battery or backup configuration.
- Confirm required permits, inspections, utility approvals, and any ownership or HOA approvals.
- Review roof condition, structural findings, electrical upgrades, removal or repair obligations, and exclusions.
- Do not authorize work based only on a preliminary sales proposal.
What it depends on
- Signed contract and final design
- Required permits and approvals
- Site and structural verification
- Installer and subcontractor responsibilities
- Payment schedule and cancellation terms
Risks and trade-offs
- Starting before approvals or final measurements can lead to delay, redesign, or added charges.
- Paying too much before completed milestones increases financial exposure.
- Unclear warranty or roof-restoration terms can create disputes after installation.
Information you may need
- Final contract and itemized price
- Approved design and equipment list
- Permit and inspection status
- Insurance, workmanship warranty, and service contacts
- Written list of exclusions and change-order rules
Your next step
What to do next
Use a written pre-start checklist and obtain confirmation of every unresolved item before authorizing mobilization or a substantial payment.