Answer
Before closing, identify every open permit, failed or incomplete inspection, correction notice, and required sign-off, and determine in writing who must resolve it and whether the system can legally operate. The buyer should not assume that the seller's purchase or the property's sale transfers those obligations without consequence.
Key points
- Obtain permit numbers, approved plans, inspection results, correction notices, and written status from the authority having jurisdiction.
- Confirm whether final approval, utility permission, or other closeout is required for operation or occupancy.
- Require the seller to disclose unresolved work and allocate completion, correction, fee, and delay responsibilities in the purchase agreement.
- Check whether the system's actual installation matches the permitted design.
What it depends on
- The applicable permitting and inspection authority
- The system's permit, inspection, and interconnection status
- The purchase agreement and seller representations
- Whether financing, insurance, utility approval, or occupancy depends on closeout
Risks and trade-offs
- Unresolved work may create safety, resale, insurance, financing, or enforcement issues.
- Corrective work can require roof access, equipment changes, or additional inspections.
- Closing before resolution may leave the buyer with cost and scheduling risk even if the seller made informal assurances.
Information you may need
- Permit and inspection records
- Approved plans and as-built documentation
- Utility and interconnection correspondence
- Seller disclosures, contract provisions, and proposed escrow or holdback terms
Your next step
What to do next
Ask the permitting authority and utility for written status, then make closing contingent on documented resolution or a negotiated, legally reviewed allocation of remaining obligations.