Answer
The buyer may inherit an unpermitted or nonconforming system, which can create inspection, interconnection, insurance, warranty, financing, resale, safety, or enforcement problems. The buyer should verify that the installed equipment and configuration match approved records before closing or require a documented remedy.
Key points
- Compare installed panels, inverters, batteries, disconnects, wiring, and layout with permits, plans, inspection records, and utility approval.
- Ask who performed the alteration and whether engineering, inspection, or utility approval was required.
- Require the seller to disclose unresolved work and define responsibility for correction, fees, and delays.
- Do not rely solely on system operation; an operating system can still lack required approvals.
What it depends on
- Local permitting and inspection rules
- Utility interconnection records
- Nature and extent of the alteration
- Insurance, lender, and warranty requirements
- Seller disclosures and contract terms
Risks and trade-offs
- Correction may require equipment replacement, rewiring, inspections, or utility review.
- The buyer may face delays or costs after closing if responsibility is not assigned.
- A visual inspection may not identify hidden or documentation-related nonconformities.
Information you may need
- Approved plans, permits, inspection sign-offs, and utility correspondence
- Current equipment inventory and photographs
- Alteration invoices and installer information
- Insurance and financing conditions
- A qualified electrical and solar inspection
Your next step
What to do next
Make verification of permits and interconnection records a closing condition or obtain written local authority and utility confirmation of the required corrective path.
Path-Q
Find the right next step
Answer a few questions and we’ll narrow your options.
Some details may depend on your location, installer, utility, incentives, regulations, or specific property.
SQ03252