Evaluate whether the long wait could change the project’s price, equipment, incentives, financing, savings assumptions, roof condition, or ability to cancel. The contract should define the installation deadline, what can change before installation, who bears delay-related costs, and what happens if approvals, equipment, or financing are unavailable.

Key points

  • Check whether pricing, estimated production, financing terms, and promised incentives are fixed or subject to later change.
  • Confirm whether equipment substitutions require your approval and whether they can affect warranties or performance.
  • Verify that the roof, electrical system, and property conditions are expected to remain suitable during the delay.
  • Review deposit protection, cancellation rights, escalation clauses, and the installer’s obligation to maintain insurance and required approvals.

What it depends on

  • Contract duration and cancellation terms
  • Financing, pricing, incentive, and tariff assumptions
  • Equipment procurement and substitution provisions
  • Permitting, interconnection, and property condition
  • Installer financial and operational stability

Risks and trade-offs

  • A long queue may secure a place with an installer but leaves more time for assumptions and market conditions to change.
  • A fixed price can protect against increases but may include broader exclusions or a higher initial price.
  • Delaying installation may avoid rushed work, but it can postpone savings and expose the roof or electrical system to further deterioration.

Information you may need

  • The promised installation window and outside completion date
  • All price, financing, incentive, production, and escalation assumptions
  • Deposit amount and refund or cancellation rights
  • Equipment, roof, permitting, and interconnection status

Your next step

What to do next

Create a written list of every assumption that must remain true until installation, then ask the installer to state which are guaranteed, which can change, and your remedy for each material change.