Path-Q Solar
Should I wait to sign a solar contract until all equipment is available?
Answer
Not necessarily, but do not sign without written confirmation of the equipment models, availability status, acceptable substitutions, price protection, delivery responsibility, and cancellation or remedy rights for material delays.
Key points
- Separate equipment already allocated or ordered from equipment that is merely listed in a proposal.
- Require model-specific specifications and written approval for substitutions that affect performance, appearance, warranty, or price.
- Check whether the contract fixes the price and schedule if delivery is delayed.
- Ask what happens to deposits, financing, permits, and the contract if a critical component becomes unavailable.
What it depends on
- Equipment supply and lead times
- Contract substitution and cancellation terms
- Whether permits or utility approvals depend on specific equipment
- The importance of timing to the homeowner
Risks and trade-offs
- Waiting may delay the project or change pricing, but signing too early can expose the homeowner to indefinite delays or unwanted substitutions.
- An available alternative may have different capacity, warranty, compatibility, or appearance.
- A deposit may be difficult to recover if the contract lacks delivery conditions.
Information you may need
- Exact equipment list and availability evidence
- Substitution, delivery, price, and cancellation clauses
- Permit and interconnection status
- Installer's estimated delivery and installation milestones
Your next step
What to do next
Ask for a written equipment-availability schedule and make any critical delivery date or substitution limit an express contract condition before signing.
Path-Q
Find the right next step
Answer a few questions and we’ll narrow your options.
Loading…