What happens if my utility limits how much solar power I can export?

Answer

An export limit may require the system to control or curtail output when on-site demand is low. The design may use smaller solar capacity, export-control equipment, batteries, load shifting, or a different interconnection arrangement, and the economic result depends on how often energy would otherwise be curtailed.

Key points

  • The limit may apply to instantaneous power, annual exports, or another utility-defined measure.
  • Export control must respond reliably to changing site load and may require compatible inverters and monitoring.
  • A battery can absorb some excess production, but it may fill before the solar day ends.
  • System size should be evaluated using hourly production, load, and curtailment rather than annual generation alone.

What it depends on

  • Utility export limit and interconnection requirements
  • On-site load profile and operating schedule
  • Battery capacity and control strategy
  • Solar system size and inverter capabilities

Risks and trade-offs

  • Curtailment can reduce production and savings from an otherwise larger array.
  • Export-control equipment adds cost and may introduce operational dependencies.
  • A design that relies on a battery may provide less benefit during extended outages or low-load periods.

Information you may need

  • Written utility interconnection and export-limit requirements
  • Interval load data and proposed production profile
  • Inverter and export-control specifications
  • Battery and load-management options

Your next step

What to do next

Confirm the utility's exact export constraint and ask for designs with no battery, controlled export, and storage, showing estimated curtailment.