How should I compare a system that maximizes self-consumption with one that maximizes grid exports?

Answer

Compare the value of each kilowatt-hour when used on-site with the compensation for exporting it, while accounting for system cost, battery cost, load timing, and export limits. The better design is the one with higher risk-adjusted net value, not necessarily the one producing or exporting the most energy.

Key points

  • On-site use may avoid a retail charge, while exported energy may receive a different and lower value.
  • Load shifting, energy efficiency, battery operation, and system orientation can change self-consumption.
  • Export-focused designs may face interconnection limits or changing compensation.
  • Include fixed charges, demand charges where relevant, degradation, and battery replacement.

What it depends on

  • Consumption profile and time of use
  • Retail and export compensation rules
  • Interconnection export limit
  • System and storage cost

Risks and trade-offs

  • Maximizing self-consumption may require storage or controls that add cost and losses.
  • Maximizing exports increases exposure to tariff changes and curtailment.
  • Oversizing for exports can reduce marginal value if compensation is low.

Information you may need

  • Interval or monthly load data
  • Current tariff and export terms
  • System production options and storage assumptions
  • Interconnection limits and upgrade costs

Your next step

What to do next

Compare at least two designs using hourly or representative load modeling and the current export terms, then stress-test lower export compensation.