What contract terms should protect me if the approved system design changes before installation?
Answer
Require written notice and your approval before material design changes, with defined limits on changes to system size, equipment, layout, production, price, schedule, warranties, and financing. The contract should provide a cancellation or remedy right if the revised design no longer meets agreed requirements.
Key points
- Attach the approved layout, equipment list, production estimate, and scope to the contract.
- Define what constitutes a material change and prohibit substitutions without consent.
- Require the installer to disclose the reason, cost, schedule, and production impact of a change.
- State whether price changes require a signed change order.
- Preserve the right to reject a change or terminate without an unreasonable penalty where appropriate.
What it depends on
- Contract attachments and specifications
- Material-change definition
- Change-order and cancellation terms
- Financing or PPA documents
- Permitting, utility, and site-discovery outcomes
Risks and trade-offs
- A smaller or lower-performing system may be installed under a broad substitution clause.
- Uncontrolled changes can affect incentives, warranties, interconnection, and economics.
- Strict approval requirements can delay the project if unexpected site conditions arise.
Information you may need
- Final design and equipment schedule
- Production estimate and performance assumptions
- Substitution and change-order clauses
- Price, schedule, and cancellation terms
- Financing or third-party ownership documents
Your next step
What to do next
Attach the approved design to the contract and negotiate a written material-change process requiring your signed approval before installation proceeds.