Should a small business get a solar feasibility study before requesting installation quotes?
Answer
Often yes, especially for a complex or high-use site, but a formal study is not always necessary before obtaining initial quotes. A feasibility review is most useful when the building, electrical service, roof, operating schedule, financing, or expansion plans could materially affect system design and economics.
Key points
- A basic preliminary assessment can identify obvious roof, shading, electrical, and consumption constraints.
- A more formal study may be justified for multiple buildings, large loads, structural questions, planned renovations, or complicated utility interconnection.
- Requesting several detailed quotes can also reveal feasibility issues, but quote assumptions may not be consistent.
- The study should address energy use, roof life, structural capacity, electrical service, production, interconnection, and financial assumptions.
What it depends on
- Site size and number of buildings
- Load profile and operating hours
- Roof condition and structural complexity
- Electrical service and planned equipment changes
- Need for financing, storage, or backup power
Risks and trade-offs
- Paying for a study before confirming that the project is viable can add cost without advancing the decision.
- Skipping analysis can lead to proposals based on incomplete load, roof, or interconnection information.
- A feasibility study is not a substitute for final engineering, permits, or utility approval.
Information you may need
- Recent electricity bills and, if available, interval usage data
- Roof plans, building information, and records of repairs
- Electrical service details and planned load growth
- The scope and deliverables of any proposed feasibility study
Your next step
What to do next
Collect bills, roof and electrical information, then ask several qualified commercial solar providers whether a preliminary assessment is sufficient or a paid feasibility study is warranted.