Answer

Evaluate only the period in which the system was operational, then compare production with a time-matched expectation for that commissioning date and the actual weather, outages, shading, and system availability. Do not compare a partial year's total directly with a full-year estimate without adjusting the period.

Key points

  • Use the actual permission-to-operate or commissioning date defined by the contract, not merely the installation date.
  • Account for startup delays, monitoring gaps, commissioning tests, and partial-day operation.
  • Compare monthly or daily performance with a model or historical baseline for the same dates.
  • Annualization from a short period is uncertain, especially near seasonal transitions.

What it depends on

  • The contractual commissioning and evaluation dates
  • Reliable production and availability records
  • Weather and irradiance during the operating period
  • System configuration and any early defects or outages

Risks and trade-offs

  • A short period may not represent annual performance.
  • Seasonal production varies substantially, so simple multiplication can mislead.
  • Production may be reduced by commissioning issues that should be analyzed separately from weather.

Information you may need

  • Commissioning, permission-to-operate, and first-production dates
  • Daily or hourly production data
  • System estimates and their calculation assumptions
  • Weather, outage, shading, and maintenance records

Your next step

What to do next

Define the valid operating window and compare its weather-adjusted production with a date-matched forecast before drawing an annual-performance conclusion.