How should I estimate savings if my system may be placed under different export rules later?
Answer
Use scenario analysis rather than one export assumption. Model current rules, a less favorable export rate, limited exports, and a self-consumption-focused design, while including the cost and feasibility of storage or load shifting.
Key points
- Separate on-site consumption savings from exported-energy revenue.
- Apply each export scenario to the system's hourly production and load profile.
- Include tariff changes, curtailment, fixed charges, battery losses, and replacement costs.
- Use conservative scenarios for financing and payback decisions.
What it depends on
- Current export terms and possible change mechanisms
- Hourly load and production profile
- Interconnection limit and curtailment risk
- Storage, controls, and load-shifting costs
Risks and trade-offs
- An export-heavy design may have weak economics under lower compensation.
- Storage can protect against export changes but may not recover its cost through bills alone.
- Future rules are uncertain, so a broad range is more informative than a precise forecast.
Information you may need
- Current tariff and export agreement
- Production and consumption data
- Alternative system and battery designs
- Utility change, curtailment, and interconnection provisions
Your next step
What to do next
Build a cash-flow model with at least four export scenarios and compare the design that remains acceptable under the least favorable plausible case.