How should I compare solar proposals that assume different export compensation?
Answer
Normalize each proposal using the same verified export rules, consumption profile, system output, degradation assumptions, financing, and cost basis. Compare self-consumed energy separately from exported energy because exported energy may receive a different value.
Key points
- Ask each installer to show annual production, on-site consumption, exports, imports, and the compensation applied to each.
- Use the utility's applicable tariff or written program terms rather than an unsupported export-rate assumption.
- Compare system cost and savings both before and after export compensation, using consistent escalation and degradation assumptions.
- Test lower-export and lower-compensation scenarios, especially if rules may change.
What it depends on
- Utility tariff and export program
- Hourly or monthly load profile
- System size, orientation, and production model
- Battery or export-limiting controls
- Financing and operating costs
Risks and trade-offs
- A larger system may produce more total energy but less valuable energy if exports are compensated poorly.
- A proposal with optimistic export assumptions can appear cheaper or faster to pay back.
- Changing tariffs or program eligibility can alter future savings.
Information you may need
- Current utility tariff and export terms
- At least one year of interval or billing data
- Production model and equipment details
- Financing, maintenance, and degradation assumptions
Your next step
What to do next
Create a side-by-side comparison using one verified export assumption and request revised proposals if their modeling assumptions differ.