Path-Q Solar

How should a small business estimate the cost of solar downtime when it must buy replacement power or suspend a revenue-producing process?

Answer

Calculate replacement-power expense and process-related economic loss as separate components for each downtime scenario. Use actual power requirements, replacement-power prices, lost contribution margin, restart costs, waste, labor, and contractual effects rather than using the electricity bill alone.

Key points

  • Determine which loads must continue and the quantity and duration of replacement power required.
  • Price grid purchases, generator fuel, rentals, labor, transfer equipment, and setup or teardown costs.
  • Estimate lost output using units not produced multiplied by contribution margin, then add restart, spoilage, overtime, and expedited delivery.
  • Model partial derating, short interruptions, and full shutdown separately.

What it depends on

  • Critical-load requirements and process operating limits
  • Historical or expected fault duration and frequency
  • Replacement-power availability and cost
  • Production economics and restart characteristics

Risks and trade-offs

  • Replacement power may protect production but introduce fuel, emissions, noise, maintenance, or safety costs.
  • Gross revenue is not the same as lost profit.
  • Rare extended outages can dominate expected annual cost even if average downtime is low.

Information you may need

  • Load lists and process power measurements
  • Production, margin, labor, and waste data
  • Fault logs and outage history
  • Quotes or records for temporary and backup power

Your next step

What to do next

Prepare a scenario-based downtime worksheet and validate the assumptions with operations, finance, and the electrical service provider.

Path-Q

Find the right next step

Answer a few questions and we’ll narrow your options.

Loading…

SQ03102