Estimate downtime cost by combining the duration and frequency of solar-related interruptions with the process's incremental contribution margin, restart and disposal costs, replacement-power costs, and any contractual or operational consequences. Use actual process records rather than gross revenue alone.

Key points

  • Measure lost units or service capacity during the interruption window.
  • Value lost production using avoidable margin or contribution profit, not automatically total sales.
  • Add labor, restart, spoiled material, overtime, expedited shipping, and temporary-power costs.
  • Model short interruptions separately from outages that force a full process shutdown.

What it depends on

  • The process affected and its minimum operating power
  • Historical fault duration and frequency
  • Production rate, contribution margin, and restart behavior
  • Availability and cost of grid, generator, or other replacement power
  • Insurance or contractual treatment of business interruption

Risks and trade-offs

  • Using average revenue can overstate or understate the economic loss.
  • A solar fault may coincide with grid outages or other causes, making attribution difficult.
  • Expected downtime estimates can hide rare but severe events.

Information you may need

  • Inverter and monitoring fault logs
  • Production, sales, labor, and waste records
  • Process power requirements and restart procedures
  • Replacement-power invoices and outage records

Your next step

What to do next

Build a scenario table for short, medium, and extended interruptions using verified production and margin data, then compare the result with resilience and maintenance options.