How can I tell whether net metering or another export arrangement applies to my system?
Answer
Check the utility's current distributed-generation tariff and interconnection terms for the property's service address. The applicable arrangement may be net metering, a credit for exported energy, avoided-cost compensation, or another structure, and it can depend on system size, customer type, application date, and whether a battery is included.
Key points
- The utility tariff, not the installer’s description alone, determines how exports are credited.
- Compare the credit value and treatment of unused credits with the value of electricity bought from the grid.
- Ask whether the arrangement can change when tariffs change or when the system is modified.
What it depends on
- Utility and service territory
- System size and export capacity
- Application or approval date
- Battery configuration and whether export control is required
- Current tariff and interconnection rules
Risks and trade-offs
- A system may produce substantial energy but provide less bill value if exports receive a lower credit than imported electricity costs.
- Adding panels or storage later may trigger a new review or alter the applicable arrangement.
- Marketing terms such as 'net metering' may not describe the actual credit calculation.
Information you may need
- Utility name and service address
- Proposed system size and battery details
- Current export tariff and interconnection agreement
- Rules for credit carryover, expiration, and settlement
Your next step
What to do next
Request the utility's current export tariff and written confirmation of the arrangement that would apply to the proposed system before signing a contract.