How can I decide whether a second site visit is necessary after a quote changes substantially?
Answer
Request a second site visit when the revised quote changes the array location, system size, electrical design, mounting method, roof assumptions, or access requirements in a way that was not verified during the first visit. A written explanation may be enough for minor, well-documented changes.
Key points
- Compare the original and revised layouts, equipment, roof areas, wiring paths, and exclusions.
- Ask which new facts caused the change and whether they were observed, measured, or merely assumed.
- Require the revised proposal to identify all changed assumptions and resulting costs or production effects.
What it depends on
- Magnitude and type of design change
- Quality of the original site documentation
- Whether the changed conditions affect safety, feasibility, or price
Risks and trade-offs
- Skipping a visit can leave the revised design based on outdated measurements.
- A second visit costs time or money but may prevent installation-day surprises.
- Repeated redesigns may indicate weak initial assessment or unresolved site constraints.
Information you may need
- Original and revised plans and equipment lists
- The reason for each material change
- Updated roof, electrical, access, and production assumptions
Your next step
What to do next
Ask the installer to mark every material revision; request a second visit if any changed item affects physical feasibility or cannot be verified from existing records.