When should I request a revised solar quote instead of accepting the original one?
Answer
Request a revised quote whenever a material assumption, design, equipment choice, price, scope, timeline, financing term, or incentive assumption changes—or when the original quote is unclear or expires. The revised document should replace conflicting terms rather than relying on verbal promises.
Key points
- Revisions are especially important after a site survey, structural or electrical finding, roof change, design change, or equipment substitution.
- Ask for updated system size, production estimate, total price, payment schedule, exclusions, warranties, and completion date.
- Require disclosure of price changes caused by permitting, interconnection, site work, taxes, or optional equipment.
- Confirm that any current incentive, eligibility, or financing assumption has been rechecked rather than carried forward automatically.
What it depends on
- What changed since the original quote
- Whether the quote has an expiration date
- Site-survey and engineering findings
- Current contract, financing, incentive, and provider terms
Risks and trade-offs
- Accepting an outdated quote can create disputes over scope, price, equipment, or responsibility.
- A lower revised price may reflect omitted work or reduced equipment rather than a true saving.
- A revised design may affect production, warranties, approvals, or future expansion.
Information you may need
- Original quote and all change communications
- Site-survey, engineering, and equipment documents
- Updated price, scope, production, schedule, and contract terms
- Current verification of financing and incentive assumptions
Your next step
What to do next
Ask the installer for a dated, itemized revision and do not accept material changes until the replacement document is complete and internally consistent.