Request separate alternatives when both sites could technically work or when the roof has meaningful limitations such as shading, age, structural uncertainty, limited usable area, or difficult access. Separate designs make the production, cost, maintenance, land-use, and permitting assumptions visible.
Key points
- Ask each design to use comparable assumptions for system output, equipment, ownership, and project scope.
- Compare roof condition, ground preparation, trenching, security, access, and future land use.
- Include the value of leaving roof space available for repairs or future equipment.
- Require each proposal to identify site-specific exclusions and uncertain costs.
What it depends on
- Roof condition and usable area
- Ground conditions, distance to the building, and electrical routing
- Shading and expected production
- Long-term plans for the land and roof
Risks and trade-offs
- Ground mounting may require more site work, fencing, and maintenance.
- Roof mounting may complicate roof repairs or be constrained by structure and access.
- The apparently cheaper option may have higher future repair, land-use, or access costs.
Information you may need
- Roof inspection and usable-area assessment
- Ground-site dimensions, slope, access, and future-use plans
- Distance to the electrical connection
- Comparable production and cost estimates
Your next step
What to do next
Ask for two itemized designs using the same electricity-use assumptions and request a side-by-side comparison of lifetime constraints, not just initial price.