Path-Q Solar
When should I ask for a revised production estimate after nearby construction changes the shading pattern?
Answer
Ask for a revised estimate as soon as construction creates a reasonably permanent change in shading or is expected to remain during the system’s operating period. Do not wait for a full year of data if the physical obstruction can already be measured or modeled.
Key points
- Document the obstruction’s height, location, orientation, and expected permanence.
- Request updated shade analysis for each affected roof section and season.
- Compare the revised estimate with the original assumptions and contract promises.
- Review whether panel relocation, trimming, design changes, or monitoring is appropriate.
What it depends on
- Construction height, distance, orientation, and completion status
- The system’s layout and the timing of shading
- Quality of the installer’s shade model and available site measurements
Risks and trade-offs
- A temporary construction shadow may not justify a permanent redesign.
- A permanent obstruction can reduce production and change the economic case.
- Relocation may improve production but involve roof work, access, and added cost.
Information you may need
- Before-and-after photographs or surveys
- Construction plans and expected completion date
- Original shade analysis and production estimate
- Current monitoring data, if available
Your next step
What to do next
Send the installer documented evidence of the changed shading and request a revised, assumption-labeled production model.