What system size is appropriate if my electricity consumption may fall after a business efficiency project?

Answer

Base the preferred size on a credible post-efficiency load forecast, while testing current-use and project-delay scenarios. If the project is uncertain or staged, a smaller initial system with a documented expansion path may be safer than sizing permanently for today’s higher consumption.

Key points

  • Estimate the efficiency project's reduction by load type, operating hours, and implementation date.
  • Separate committed savings from aspirational or unverified savings.
  • Check whether the proposed system can be expanded without replacing major equipment.
  • Evaluate both annual energy offset and demand-period performance.

What it depends on

  • Expected efficiency savings and confidence in those savings
  • Project timing and implementation scope
  • Current load profile and business growth
  • Roof, interconnection, inverter, and service constraints

Risks and trade-offs

  • Sizing for current load can create excess production after efficiency improvements.
  • Sizing only for forecast savings can underproduce if the project underperforms.
  • Deferring solar may lose time or incur different costs, while oversizing may reduce utilization.

Information you may need

  • Current bills and interval demand data
  • Efficiency project specifications and savings estimate
  • Implementation schedule and verification method
  • Expansion constraints and business growth expectations

Your next step

What to do next

Compare current-load, verified-post-project, and project-delay cases, then request a design that states what expansion provisions are included.