Treat a satellite-based quote as preliminary and verify roof condition, measurements, shading, electrical equipment, access, obstructions, and installation constraints before accepting a final price or schedule.
Key points
- Satellite imagery may not show roof damage, penetrations, roof layers, trees, vents, conduit routes, or service-panel limitations.
- Ask which assumptions are provisional and which conditions trigger a price or design change.
- Require an on-site assessment or clearly defined inspection milestone before major payment or construction.
What it depends on
- Roof age, material, condition, and geometry
- Electrical service and equipment location
- Site access, shading, and obstructions
- Installer's change-order process
Risks and trade-offs
- Unverified assumptions can lead to redesign, delays, or additional charges.
- Roof repairs or replacement may be discovered after commitment.
- A remote estimate may be useful for initial comparison but is weaker evidence of final feasibility.
Information you may need
- List of assumptions used in the quote
- Inspection scope and timing
- Roof and electrical records
- Change-order pricing and cancellation terms
Your next step
What to do next
Ask for a documented site inspection before signing a final contract and require all material assumptions and change-order triggers in writing.