Answer
Verify the utility's allowed export capacity, application rules, compensation structure, and any limits based on the property's service or account. A system larger than current usage may still be feasible, but excess generation could be curtailed, compensated differently, or require upgrades and controls.
Key points
- Distinguish the system's DC size, inverter AC output, and the export limit approved at the point of interconnection.
- Ask whether export limits apply to instantaneous output, annual energy, or both.
- Model the economics under curtailment, self-consumption, storage, and different export compensation assumptions.
What it depends on
- Utility interconnection rules and tariff
- Service capacity and local circuit conditions
- System inverter size and control equipment
- Load profile, storage, and compensation for exported energy
Risks and trade-offs
- A larger array may produce less economic value if exports are curtailed or poorly compensated.
- Upgrades or export-control equipment can increase cost and delay approval.
- Designing to annual usage alone may ignore seasonal production and instantaneous export limits.
Information you may need
- Written utility export and interconnection limits
- Site service information and recent electricity bills
- Proposed array and inverter ratings
- Production, load, and curtailment model
Your next step
What to do next
Obtain a preliminary interconnection review from the utility or qualified provider for the proposed inverter output and export level before finalizing the system size.