Answer

First verify that the comparison uses the same time period, system assumptions, and measured production rather than bill changes alone. Then document the shortfall, check monitoring and equipment alerts, and ask the installer for a written diagnosis and corrective plan. If the disagreement remains, obtain an independent performance assessment and review the contract's warranty or production commitments.

Key points

  • Production varies with weather, shading, soiling, outages, equipment downtime, and changes to the system.
  • Use inverter or meter data where possible and compare against an appropriate modeled baseline.
  • Record dates, alerts, photographs, utility data, and communications with the installer.
  • Ask whether the issue is design-related, equipment-related, installation-related, measurement-related, or caused by external conditions.
  • Check what remedies, exclusions, response times, and dispute processes apply under the contract.

What it depends on

  • The estimator's assumptions, baseline, and stated tolerance
  • Actual weather, shading, soiling, outages, and system availability
  • Accuracy and completeness of monitoring and meter data
  • Contract terms, warranties, guarantees, and maintenance responsibilities

Risks and trade-offs

  • A short period of low production does not necessarily prove a defect.
  • Continuing to operate faulty equipment can increase damage or safety risk.
  • Independent testing costs money but may clarify responsibility.
  • A contractual production guarantee may differ from an estimate and may exclude several causes of lower output.

Information you may need

  • Original proposal, production model, assumptions, and any guarantee
  • Production and outage data for the relevant period
  • Weather, shading, maintenance, error, and repair information
  • System configuration and warranty or service documents

Your next step

What to do next

Send the installer a written performance record and request a diagnostic report with measured findings, corrective actions, and timing; escalate to an independent professional if the response is inadequate.