Path-Q Solar
What should I do if I expect roof work during the system's life but the solar quote does not address panel removal and reinstallation?
Answer
Do not accept the quote until it states whether future panel removal and reinstallation are included, excluded, or handled by another provider, with responsibilities, pricing method, warranty effects, and scheduling process documented.
Key points
- Ask who disconnects, removes, stores, reinstalls, tests, and recommissions the system.
- Clarify treatment of roof repairs, replacement materials, damaged equipment, and any resulting production loss.
- Ask whether removal and reinstallation affect workmanship, roof, equipment, or monitoring warranties.
What it depends on
- Expected roof work and timing
- System attachment, equipment, and warranty terms
- Installer availability and future service arrangements
Risks and trade-offs
- Future removal can be expensive and may not be covered by the original installation price.
- Using an unqualified third party can create electrical, roof, or warranty problems.
- Roof work may take longer if the solar provider is unavailable.
Information you may need
- Written removal and reinstallation terms
- Itemized or defined pricing and exclusions
- Warranty and responsibility provisions for future roof work
Your next step
What to do next
Request a written future-roof-work clause and an estimated removal/reinstallation cost before signing; if the installer will not define it, obtain another proposal.
Path-Q
Find the right next step
Answer a few questions and we’ll narrow your options.
Loading…
SQ02841