Path-Q Solar

What should I ask an installer about production assumptions in a quote?

Answer

Ask the installer to show exactly how expected production was calculated, including site measurements, shading, equipment, losses, weather data, degradation, availability, and uncertainty. Ask for monthly results and a clear distinction between production, bill savings, and financial return.

Key points

  • Request the modeled layout, roof orientation and tilt, shading analysis, and usable-area assumptions.
  • Ask for exact panel, inverter, optimizer, and battery models and their operating assumptions.
  • Review loss assumptions for temperature, wiring, mismatch, soiling, snow, downtime, clipping, and curtailment.
  • Ask what solar-resource data and time period were used and whether the estimate includes an uncertainty or sensitivity case.
  • Request monthly production, first-year production, degradation treatment, and the inputs used to calculate bill savings.

What it depends on

  • Quality of the site survey and shading analysis
  • Equipment and system layout
  • Solar-resource data and modeling method
  • Utility tariff and export assumptions
  • Maintenance, downtime, and degradation assumptions

Risks and trade-offs

  • Comparing quotes with different assumptions can make one proposal appear better unfairly.
  • Production guarantees may exclude weather, grid outages, shading changes, or equipment downtime.
  • Savings estimates can be overstated if export credits, fixed charges, or rate changes are treated incorrectly.

Information you may need

  • Complete production model and assumptions
  • Equipment models and layout
  • Monthly production and loss breakdown
  • Tariff, export, and savings assumptions
  • Any production guarantee and exclusions

Your next step

What to do next

Ask each installer to complete the same production-assumption checklist and compare the proposals using a common, conservative modeling basis.

Path-Q

Find the right next step

Answer a few questions and we’ll narrow your options.

Loading…

SQ00159