Path-Q Solar
What should be included in the quoted price for removing and reinstalling panels later?
Answer
The quote should state whether future removal and reinstallation are included, excluded, or priced by a defined method, and should identify labor, electrical disconnection, storage, transport, roof work, permits, inspection, testing, and replacement parts. It should also state what happens if panels, racking, wiring, or roof materials are damaged or unavailable.
Key points
- Define the triggering event, such as roof replacement or repair, and who may request the work.
- Specify whether removal and reinstallation are performed by the original installer or another qualified provider.
- Address warranty preservation, roof repairs, flashing replacement, and system recommissioning.
- Do not treat a general service warranty as a promise to remove and reinstall panels.
What it depends on
- The roof's expected service life and condition
- The system's attachment, wiring, and equipment design
- The installer's future service policy and pricing method
Risks and trade-offs
- Future costs can be substantial and are often excluded from the initial installation price.
- Reinstallation may require replacement clips, seals, wiring, or damaged modules.
- A third party's work may affect installer or manufacturer warranties.
Information you may need
- A written future-removal scope and price or pricing formula
- Storage, roof-repair, permit, inspection, and warranty terms
- The expected roof-replacement timeframe
Your next step
What to do next
Ask each installer to provide a separate line item for future removal and reinstallation, including assumptions and exclusions, before comparing quotes.
Path-Q
Find the right next step
Answer a few questions and we’ll narrow your options.
Loading…
SQ01484