What risks should I consider before signing a solar power purchase agreement?
Answer
Review the PPA's long-term price, escalation, production and billing rules, maintenance obligations, transfer requirements, buyout terms, and consequences of moving, refinancing, or replacing the roof. The most important risk is accepting a long contract whose future cost or exit conditions are unclear.
Key points
- Confirm who owns the equipment and who is responsible for repairs, insurance, monitoring, and damage.
- Understand whether payments depend on actual production and how disputes are handled.
- Review what happens if production is lower than forecast or the system is unavailable.
- Check sale, transfer, buyout, removal, and roof-replacement provisions.
- Compare the PPA with cash purchase, loan, and lease options using total net cost.
What it depends on
- PPA price and escalation
- Production and billing provisions
- Contract term
- Maintenance, insurance, and performance obligations
- Transfer, buyout, and termination terms
- Utility and property circumstances
Risks and trade-offs
- Long-term obligations can limit flexibility if the homeowner moves or usage changes.
- The provider's production forecast may not equal the homeowner's actual bill savings.
- Contract terms may affect a sale, refinance, roof replacement, or insurance arrangement.
Information you may need
- Complete PPA contract
- Provider performance and maintenance commitments
- Buyout, transfer, and termination calculations
- Comparable ownership proposals
Your next step
What to do next
Have the full agreement reviewed for price escalation, exit, transfer, and roof-related clauses before signing.