What project costs are likely when a solar installation requires a long cable route through the building?
Answer
A long interior cable route can add costs for longer conductors, conduit, penetrations, firestopping, access work, protection, and labor; the amount cannot be estimated reliably without a route-specific design and quote.
Key points
- The route's length, conductor size, voltage, and whether it is AC or DC affect material and labor requirements.
- Finished walls, ceilings, fire-rated assemblies, hazardous areas, and difficult access can increase work.
- Electrical losses and voltage drop may require larger conductors or a different equipment location.
What it depends on
- Measured route length and accessibility
- Conductor requirements and voltage-drop limits
- Building construction and finish restoration
- Equipment locations and required penetrations
Risks and trade-offs
- The least expensive route may be more visible or disruptive.
- Poorly documented penetrations can create moisture, fire, or maintenance risks.
- A longer route may reduce efficiency or require larger conductors.
Information you may need
- Marked-up site and floor plans
- Proposed cable type, length, and routing method
- Details of wall, ceiling, roof, and fire-rated penetrations
Your next step
What to do next
Obtain an itemized quote with the cable route, penetrations, restoration, conductor sizing, and any alternatives shown separately.