Answer

Compare the complete installed scope, not just the price per watt. The main cost drivers are system size and equipment, roof complexity, electrical work, structural needs, access, permitting and interconnection scope, monitoring, warranty and service terms, and any exclusions or change-order assumptions.

Key points

  • Confirm that each proposal includes the same panel capacity, inverter architecture, storage, and expected production basis.
  • Check whether roof repairs, structural reinforcement, trenching, service work, permits, inspection, and interconnection are included.
  • Separate optional items from required work and identify taxes, fees, and post-installation service.
  • Compare warranty coverage, workmanship responsibility, monitoring, and removal or reroofing terms.

What it depends on

  • Roof condition and complexity
  • Electrical service and interconnection needs
  • Equipment and system architecture
  • Site access and structural requirements
  • Contract scope and provider service terms

Risks and trade-offs

  • A low headline price may exclude necessary electrical or roof work.
  • A higher price may reflect better equipment or a more complete scope, but price alone does not prove quality.
  • Change orders can materially alter the final cost if assumptions are not documented.

Information you may need

  • Itemized proposals
  • System layout and production estimates
  • Equipment, warranty, and service details
  • Roof, electrical, permit, and interconnection inclusions
  • Payment and change-order terms

Your next step

What to do next

Put competing proposals into a common comparison table and ask each provider to confirm every inclusion, exclusion, assumption, warranty, and potential change order in writing.