What contract language should address damage to landscaping during solar installation?
Answer
The contract should state that the installer is responsible for damage caused by its employees, subcontractors, vehicles, equipment, excavation, and material handling, while also documenting existing conditions and defining the repair or reimbursement process.
Key points
- Attach dated photographs or a written condition report covering lawns, trees, beds, irrigation, hardscape, fencing, and access routes.
- Define reasonable protection measures, such as designated paths, equipment limits, and protection of roots or irrigation lines.
- Require prompt notice of damage and specify whether the installer will repair, replace, or reimburse restoration.
- State who is responsible for damage caused by subcontractors.
What it depends on
- The installation method and equipment access requirements
- Existing landscaping condition and value
- Whether trenching, tree trimming, or underground work is planned
- The contract's damage, indemnity, and dispute provisions
Risks and trade-offs
- Strict restoration language may increase the quote or restrict access options.
- Plants may decline later from root damage even when no immediate damage is visible.
- Broad exclusions for pre-existing conditions can make responsibility difficult to establish.
Information you may need
- A site plan showing access, staging, trenching, and equipment areas
- Photographs of existing landscaping and irrigation
- The proposed damage and restoration clause
- Any required tree, landscape, or property rules
Your next step
What to do next
Request a written landscaping protection and restoration clause, attach a pre-work condition record, and have the installer identify any areas it cannot protect.