Path-Q Solar
Should I reduce my electricity use before getting a solar system designed?
Answer
Reduce electricity use first when you already plan meaningful efficiency improvements or equipment changes; otherwise, obtain a preliminary solar design using current data and have it adjusted for any credible future changes rather than waiting without a defined plan.
Key points
- Prioritize known, funded, and measurable changes over speculative future savings.
- Provide installers with planned heating, cooling, water-heating, appliance, vehicle, or building changes.
- Ask for designs based on current use and realistic post-improvement use so the effect on system size is visible.
- Preserve flexibility if future electrification may increase consumption after efficiency improvements.
What it depends on
- Certainty, timing, and size of planned efficiency changes
- Future electrification or business and household load growth
- Roof and project timing
- How system size affects cost, production, and expected value
Risks and trade-offs
- Sizing only to current use can oversize the system after major efficiency improvements.
- Sizing too aggressively to uncertain future loads can increase cost without guaranteed benefit.
- Delaying design until all changes are complete may postpone a project and lose useful information about feasibility.
Information you may need
- Current bills and usage patterns
- Planned efficiency and electrification projects with dates and estimates
- Roof, electrical, and equipment constraints
- Comparative designs for current and expected future loads
Your next step
What to do next
Create a realistic load forecast, then ask for a preliminary design and a post-improvement design before deciding whether to complete efficiency work first.
Path-Q
Find the right next step
Answer a few questions and we’ll narrow your options.
Loading…
SQ01082