How should loan payments made before the solar system begins operating be included in the project's cash-flow analysis?
Answer
Record every pre-operation payment in the month it is actually paid, before counting any solar savings. Include whether interest accrues, whether the balance changes, and whether the payment is refundable or deferred.
Key points
- Pre-operation payments reduce cash available even though the system produces no savings yet.
- Use actual payment dates for cash-flow and liquidity analysis.
- Distinguish interest-only payments from principal-reducing payments.
- Include the effect of construction delays or delayed permission to operate.
What it depends on
- Loan funding and first-payment date
- Construction and operating timeline
- Interest-accrual rules
- Payment treatment during delays
Risks and trade-offs
- Ignoring these payments understates the project's initial cash burden.
- A delayed operation date can create a period of payments without offsetting savings.
- Payments that reduce principal may improve later interest cost but still require early liquidity.
Information you may need
- Loan disbursement and payment schedule
- Expected operating date
- Interest and principal allocation
- Delay and cancellation provisions
Your next step
What to do next
Add a month-by-month pre-operation period to the project cash-flow model and test reasonable installation-delay scenarios.