Answer
Use the same lifetime cash-flow method for both designs and include the expected replacement cost in the year it is likely to occur, adjusted for uncertainty if appropriate. Do not treat a future replacement as an immediate cost or omit it simply because it falls after simple payback.
Key points
- Include replacement equipment, labor, disposal, downtime, and any related electrical work.
- Compare simple payback and discounted cash flow separately because they answer different questions.
- Use the same energy production, tariff, degradation, and financing assumptions for both designs.
- Test earlier and later replacement scenarios because timing is uncertain.
What it depends on
- Expected inverter life and replacement timing
- Replacement cost and compatibility
- Energy production and degradation
- Import-export valuation
- Discount rate, financing, and ownership period
Risks and trade-offs
- A design with faster initial payback may have higher lifetime costs.
- Future equipment prices and technology compatibility are uncertain.
- Excluding replacement can make long-lived systems appear more profitable than they are.
Information you may need
- Inverter warranty and replacement assumptions
- Itemized replacement-cost estimate
- Ownership horizon
- Common cash-flow assumptions for both designs
Your next step
What to do next
Build side-by-side lifetime cash flows with replacement in the expected year and sensitivity cases for earlier, later, and higher-cost replacement.