Match the battery system's continuous output and short-duration surge capability to the appliance's running load and startup demand, while also checking inverter waveform, duration, and the loads that may start simultaneously. A battery with enough stored energy may still fail if its inverter cannot supply the required instantaneous power.

Key points

  • Identify motor, compressor, pump, and other loads with high inrush or startup demand.
  • Use measured or manufacturer-provided startup and running values rather than only the appliance's nominal rating.
  • Add simultaneous loads and account for battery state of charge, temperature, and output derating.
  • Consider soft starters, load sequencing, dedicated backup circuits, or excluding the largest loads.

What it depends on

  • Appliance running and startup power
  • Duration of startup demand
  • Battery inverter continuous and surge ratings
  • Other simultaneous backup loads
  • Battery state-of-charge and environmental derating

Risks and trade-offs

  • Undersized output can trip the inverter, interrupt appliances, or damage equipment.
  • Oversizing for rare startup events increases cost and may reduce overall value.
  • Manufacturer surge ratings may apply only for limited duration or specific operating conditions.

Information you may need

  • Appliance nameplates and manuals
  • Measured startup demand where available
  • List of loads intended to operate together
  • Battery and inverter specifications
  • Backup priorities and acceptable load shedding

Your next step

What to do next

Create a simultaneous-load and startup-power schedule, then have the battery designer verify continuous, surge, duration, and control limits.