Answer

Review an itemized scope that identifies equipment, labor, permits, design, interconnection, site preparation, commissioning, taxes, and restoration, and lists every exclusion. Ask who pays for conditions such as roof repair, structural reinforcement, electrical upgrades, trenching, crane access, change orders, and inspection corrections.

Key points

  • A single total price is not enough to establish scope completeness.
  • Confirm whether sales tax, permit and utility fees, engineering, inspections, and startup are included.
  • Check labor for mounting, wiring, monitoring, battery work, roof work, and site restoration.
  • Require written change-order rules and responsibility for unforeseen conditions.

What it depends on

  • Proposal scope and exclusions
  • Site and roof conditions
  • Electrical service and interconnection requirements
  • Local permit and inspection requirements
  • Contract change-order terms

Risks and trade-offs

  • An incomplete quote can appear cheaper but create substantial later charges.
  • Fixed pricing may still contain allowances or exclusions.
  • Unclear responsibility can delay completion or interconnection.

Information you may need

  • Itemized quote and contract
  • Site assessment
  • Permit and utility scope
  • Allowance and change-order schedule

Your next step

What to do next

Use a written inclusion-and-exclusion checklist and obtain confirmation that each item is included, priced as an allowance, or assigned to a named party.