Answer
Reassess solar after the roof design is sufficiently defined. Compare the post-renovation roof’s usable area, orientation, slope, shading, structural capacity, access, and electrical routing with the original design; do not assume the existing proposal remains valid.
Key points
- Ask for a revised layout based on construction drawings or final roof geometry.
- Include new dormers, ridges, parapets, vents, skylights, nearby structures, and temporary or permanent shading.
- Consider whether the roof work creates a better opportunity to install wiring or replace an aging roof before panels are mounted.
- Compare revised production and cost with alternatives such as a different roof plane, ground mount, or delayed installation.
What it depends on
- Final roof geometry and materials
- Shading and usable roof area
- Structural and access requirements
- Electrical routing and construction schedule
Risks and trade-offs
- Installing before the roof change may require removal and reinstallation.
- A smaller post-renovation system may reduce production but avoid expensive modifications.
- Roof design choices that improve appearance or building function may reduce solar suitability.
Information you may need
- Proposed roof plans and construction timeline
- Roof material, age, and structural information
- Updated shading and access assessment
- Revised production, scope, and cost estimate
Your next step
What to do next
Give the final or near-final roof plans to an installer and request a revised solar layout and comparison with the original design before construction is finalized.