Answer
Compare the installed system with permit, utility, design, and equipment records, and have a qualified professional inspect for changes that are not documented.
Key points
- Compare panel, inverter, battery, racking, wiring, disconnect, and monitoring details with approved plans and original invoices.
- Look for added or removed equipment, altered wiring, extra circuits, relocated components, and mismatched serial numbers.
- Request final inspection, permission-to-operate, utility, monitoring, and maintenance records.
What it depends on
- Available permit and utility records
- The original system design and equipment list
- The quality and scope of the inspection
Risks and trade-offs
- Undocumented modifications may create safety, warranty, insurance, financing, or resale problems.
- A visual inspection may not identify concealed wiring or software changes.
- Correcting past work may require redesign, inspection, or replacement.
Information you may need
- Approved plans and permit records
- Utility interconnection and operating records
- Original and current equipment lists
- Independent inspection findings
Your next step
What to do next
Make document review and an independent system inspection conditions of purchase, with responsibility for correcting discrepancies stated in the contract.